PV installations and estimated total kWh produced by district (2010 - 2014)
Stock of PV installations and estimated total kWh produced by connected PVs by district and years (2010 - 2014).
Simple
- Date (Publication)
- 2023-05-31
- Date (Revision)
- 2024-08-12
- Date (Creation)
- 2023-05-31
- Citation identifier
- haleconnect.com/f7020027-2e39-48bc-a292-71b143ef42d7
- Point of contact
-
Organisation name Individual name Electronic mail address Role National Statistics Office
National Statistics Office
Point of contact
- Access constraints
- Other restrictions
- Other constraints
- no limitations to public access
- Use constraints
- Other restrictions
- Other constraints
-
Attribution-NonCommercial-NoDerivatives 4.0 International
- Spatial representation type
- Vector
- Language
- English
- Topic category
-
- Environment
- Unique resource identifier
- ETRS89
- Distribution format
-
Name Version onLine
1.0
- OnLine resource
-
Protocol Linkage Name https://haleconnect.com/ows/services/org.1261.3928c9ae-ebdc-4923-9925-d47c5965e136_wfs?SERVICE=WFS&Request=GetCapabilities
- OnLine resource
-
Protocol Linkage Name https://haleconnect.com/ows/services/org.1261.3928c9ae-ebdc-4923-9925-d47c5965e136_wms?SERVICE=WMS&Request=GetCapabilities
- Hierarchy level
- Dataset
- Other
-
dataset
Domain consistency
- Measure identification
- INSPIRE Data Specification on Population Distribution - Technical Guidelines
Conformance result
- Title
-
INSPIRE Data Specification on Population Distribution - Technical Guidelines
- Date (Publication)
- 2013-12-10
- Explanation
-
See the referenced specification
- Pass
- Yes
Domain consistency
- Measure identification
- Commission Regulation (EU) No 1089/2010 of 23 November 2010 implementing Directive 2007/2/EC of the European Parliament and of the Council as regards interoperability of spatial data sets and services
Conformance result
- Statement
-
Data was collected as at end of February 2015 . Actual output (kWh) for 2012 and 2013 (MALTA) was reported by Automated Revenue Management Services Ltd (ARMS). Estimated output for 2010, 2011 and 2014 (MALTA) was based on the relation between actual data (kWh) reported by ARMS Ltd. in 2012 and 2013 and the kWp installations for these two years. The connection month and monthly performance levels of a PV system were taken into consideration. District output was estimated on the basis of the connection month and the corresponding kWp.
Metadata
- File identifier
- 088b770a-b672-46e4-a806-3928ddb889f7 XML
- Metadata language
- English
- Character set
- UTF8
- Hierarchy level
- Dataset
- Hierarchy level name
-
Dataset
- Date stamp
- 2024-08-12
- Metadata standard name
-
ISO 19115
- Metadata standard version
-
2003
- Metadata author
-
Organisation name Individual name Electronic mail address Role National Statistics Office
National Statistics Office
Point of contact